Country-specific legal frameworks for data centre waste heat utilisation. This chapter maps EU Directive 2023/1791 and Delegated Regulation 2024/1364 to the national transpositions in Germany, France, the Netherlands, Ireland, Italy, Spain, and the Nordics. For each member state it identifies the law, the competent authority, thresholds, and applicable deadlines.

Note
This overview is a working reference for operators and auditors. It does not replace legal counsel for specific filings. Where a text in your country differs from our representation, the national legal text prevails. Please report changed deadlines or new implementing regulations to /contact.

1. EU Baseline

Two legal acts form the common foundation: the recast Energy Efficiency Directive (EU) 2023/1791 and Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024.

1.1 Directive (EU) 2023/1791 (EED)

Article 12 requires member states to impose annual reporting on data centres with an installed IT capacity of 500 kW or more, following a common European template. Article 26 creates a general obligation to use waste heat in district heating and cooling networks and sets an annual increase of 2.2 percentage points of renewable and unavoidable waste heat until 2030. The transposition deadline was 11 October 2025.

1.2 Delegated Regulation (EU) 2024/1364

The regulation operationalises Article 12. Annexes I and II contain the mandatory reporting template covering area, IT load, energy consumption by source, renewable share, water consumption, battery capacity, reused waste heat, and grid services. The measurement basis is the Energy Reuse Factor per CEN/CENELEC EN 50600-4-6. First filing was on 15 September 2024, subsequent filings annually by 15 May.

2. National Transpositions

The following sections summarise the transposition status in the member states relevant to Ardor. Status labels refer to platform coverage, not to the state of legislation.

🇩🇪Germany

Live

Legal Basis

LawEnergy Efficiency Act (EnEfG), in force since 18 November 2023
Sections§§ 11, 12, 16, 17 EnEfG
EU actTransposition of Directive (EU) 2023/1791 and Delegated Regulation (EU) 2024/1364

Competent Authority

Federal Office for Economic Affairs and Export Control (BAFA), Section 511 (Federal Energy Efficiency Agency, BfEE), Eschborn

Reporting Obligation

Data centres from 300 kW IT nameplate capacity (§ 13 EnEfG). Additional obligations from 500 kW (§ 17 EnEfG).

Reuse Obligation

Data centres from 1 MW: 10% Energy Reuse Factor (ERF) from 1 July 2026, 15% from 1 July 2027, 20% from 1 July 2028. Evidence via the Data Centre Register and the Waste Heat Platform.

Deadlines

Annual report due by 31 March of the following year. First filing to the Waste Heat Platform was 1 January 2024; first ERF audit by 31 March 2027.

Platform

Data Centre Register (BAFA) + Waste Heat Platform (BfEE). As of January 2025: 2,668 companies, 19,065 waste heat potentials, 160 TWh/year aggregated.

Ardor status: Ardor maintains 32 German facilities with full EnEfG report generation.

🇫🇷France

Port in preparation

Legal Basis

LawLoi n° 2025-391 du 30 avril 2025 (DDADUE)
DecreeDécret n° 2025-1382 du 29 décembre 2025
CodificationArt. L.236-2 Code de l'énergie

Competent Authority

Direction générale de l'énergie et du climat (DGEC), Ministère de la Transition écologique

Reporting Obligation

Data centres from 500 kW IT load. Annual public filing on area, energy consumption, installed capacity, and waste heat utilisation.

Reuse Obligation

Data centres from 1 MW must valorise waste heat via a heating or cooling network, achieve a numerical indicator of 0.20, or demonstrate a cost-benefit exemption.

Deadlines

First filing was 15 May 2024, compliance deadline was 11 October 2025. Subsequent filings annually by 15 May.

Platform

National filing to DGEC, supplemented by the EU database per Annex II of Delegated Regulation 2024/1364.

Ardor status: Ardor maintains 15 French facilities. The port for Code de l'énergie, DGEC template, and French translation is in progress. District heating data from France Chaleur, Fonds Chaleur (ADEME), and SNCU are integrated.

🇳🇱Netherlands

Port in preparation

Legal Basis

TranspositionTransposition of Directive (EU) 2023/1791 via the RVO reporting procedure
Framework lawOmgevingswet (Environment Act, 2024)
Mandatory measuresErkende Maatregelenlijst (Recognised Energy-Saving Measures List)

Competent Authority

Rijksdienst voor Ondernemend Nederland (RVO)

Reporting Obligation

Data centres from 500 kW IT load (EU basis). Additional audit obligation from 50,000 kWh/year electricity or 25,000 m³/year gas.

Reuse Obligation

Data centres from 1 MW: waste heat utilisation or documented exemption (EU basis per Art. 26 EED).

Deadlines

Annual filing by 15 May. A standalone data centre law has not yet been published; regulatory pressure is increasing after the 2026 Leitmotiv audit (104 of approximately 160 data centres reported, several hyperscalers submitted empty forms).

Platform

RVO portal feeding into the EU database.

Ardor status: Ardor maintains 20 Dutch facilities. The Dutch Data Center Association is a potential channel partner. District heating data: Ennatuurlijk, Vattenfall NL, HVC, Stadsverwarming Purmerend, Eneco, and municipal utilities.

🇮🇪Ireland

Preliminary

Legal Basis

EED transpositionIn preparation by the Interdepartmental Working Group
RegulationCRU decision December 2025
Grid rulesEirGrid and ESB Networks framework by end of March 2026

Competent Authority

Commission for Regulation of Utilities (CRU), additionally Sustainable Energy Authority of Ireland (SEAI, monitoring)

Reporting Obligation

Data centres from 500 kW IT load (EU basis).

Reuse Obligation

New data centres must feed power back to the grid after six years and source 80% of consumption from renewables. Waste heat utilisation is secondary due to weak district heating infrastructure; exemption on grounds of technical impossibility is the norm.

Deadlines

Annual EED filing from 15 May 2026. CRU implementation rules expected by end of March 2026.

Platform

gov.ie and SEAI monitoring.

Ardor status: Ardor positions itself for Ireland as a CRU compliance tool and evidence package for the waste heat exemption, not as a district heating platform.

🇮🇹Italy

On hold

Legal Basis

StatusTransposition deadline of 11 October 2025 missed
DraftDecreto legislativo in public consultation
Additional frameworkDecreto Energia 2025
Management systemISO 50001 mandatory for enterprises above 85 TJ/year from 11 October 2027

Competent Authority

Expected: MASE (Ministero dell'Ambiente e della Sicurezza Energetica) and GSE (Gestore dei Servizi Energetici)

Reporting Obligation

Data centres from 500 kW IT load from 15 May 2026 (EU basis).

Reuse Obligation

Data centres from 1 MW (EU basis per Art. 26 EED).

Deadlines

Annual EED filing from 15 May 2026. National deadlines follow the Decreto legislativo.

Platform

EU database via MASE/GSE (expected).

Ardor status: Ardor maintains seed data for 6 Italian facilities. District heating data: AIRU (association), A2A (Milan, Brescia), Iren (Turin, Genoa, Parma), Hera (Bologna, Emilia-Romagna).

🇪🇸Spain

On hold

Legal Basis

StatusDraft Real Decreto in public consultation since 15 September 2025, draft published 16 December 2025
RequirementsPUE < 1.2, NIS2 cybersecurity, mandatory emissions reporting

Competent Authority

Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO)

Reporting Obligation

Data centres from 500 kW IT load (EU basis).

Reuse Obligation

Data centres from 1 MW (EU basis per Art. 26 EED). Spanish additional requirements stricter than EU baseline.

Deadlines

Upon adoption of the Real Decreto, expected Q2–Q3 2026.

Platform

MITECO portal, supplemented by the EU database.

Ardor status: Ardor maintains seed data for 6 Spanish facilities. District heating data: ADHAC, Ecoenergies Barcelona, Veolia España, Engie España.

🇸🇪🇩🇰🇫🇮Nordics (Sweden, Denmark, Finland)

On hold

Legal Basis

TranspositionDirective (EU) 2023/1791 via national energy agencies
SpecificityDistrict heating is widespread; waste heat utilisation is already practised voluntarily

Competent Authority

Energimyndigheten (SE), Energistyrelsen (DK), Energiavirasto (FI)

Reporting Obligation

Data centres from 500 kW IT load (EU basis).

Reuse Obligation

Data centres from 1 MW (EU basis per Art. 26 EED).

Deadlines

Annual EED filing from 15 May 2026 for reporting year 2025.

Platform

National energy agencies feeding into the EU database.

Ardor status: Ardor positions the platform for the Nordics as automation of existing waste heat utilisation, not methodology validation. Examples: Google Hamina (approx. 80% of local district heating), Microsoft Espoo (approx. 40%), Stockholm Exergi with 30+ connected data centres. Ardor maintains seed data for 24 facilities (SE/NO/FI).

3. Non-EU Facilities

Norway and Switzerland are maintained in the Ardor platform under bilateral recognition but are not subject to EED obligations. The United Kingdom is likewise not bound by the EED post-Brexit; ESOS and a developing Energy Security Bill apply there. For these countries, Ardor maintains facility data in the marketplace but does not generate EU-compliant compliance reports.

4. Deadline Overview

DateEvent
2024-09-15First EU-wide filing per Del. Reg. 2024/1364
2025-05-15Second annual filing EU-wide (reporting year 2024)
2025-10-11EED 2023/1791 transposition deadline (France: compliance date)
2026-05-15Annual filing (reporting year 2025), first mandatory round for Italy, Nordics
2026-07-01Start of 10% ERF quota for new German data centres from 1 MW (§ 11 EnEfG)
2027-03-31First ERF audit by BAFA for Germany
2027-05-15Annual filing (reporting year 2026)
2027-07-01Increase of German ERF quota to 15%
2028-07-01Increase of German ERF quota to 20%