Regulation
Country-specific legal frameworks for data centre waste heat utilisation. This chapter maps EU Directive 2023/1791 and Delegated Regulation 2024/1364 to the national transpositions in Germany, France, the Netherlands, Ireland, Italy, Spain, and the Nordics. For each member state it identifies the law, the competent authority, thresholds, and applicable deadlines.
1. EU Baseline
Two legal acts form the common foundation: the recast Energy Efficiency Directive (EU) 2023/1791 and Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024.
1.1 Directive (EU) 2023/1791 (EED)
Article 12 requires member states to impose annual reporting on data centres with an installed IT capacity of 500 kW or more, following a common European template. Article 26 creates a general obligation to use waste heat in district heating and cooling networks and sets an annual increase of 2.2 percentage points of renewable and unavoidable waste heat until 2030. The transposition deadline was 11 October 2025.
1.2 Delegated Regulation (EU) 2024/1364
The regulation operationalises Article 12. Annexes I and II contain the mandatory reporting template covering area, IT load, energy consumption by source, renewable share, water consumption, battery capacity, reused waste heat, and grid services. The measurement basis is the Energy Reuse Factor per CEN/CENELEC EN 50600-4-6. First filing was on 15 September 2024, subsequent filings annually by 15 May.
2. National Transpositions
The following sections summarise the transposition status in the member states relevant to Ardor. Status labels refer to platform coverage, not to the state of legislation.
🇩🇪Germany
LiveLegal Basis
| Law | Energy Efficiency Act (EnEfG), in force since 18 November 2023 |
| Sections | §§ 11, 12, 16, 17 EnEfG |
| EU act | Transposition of Directive (EU) 2023/1791 and Delegated Regulation (EU) 2024/1364 |
Competent Authority
Federal Office for Economic Affairs and Export Control (BAFA), Section 511 (Federal Energy Efficiency Agency, BfEE), Eschborn
Reporting Obligation
Data centres from 300 kW IT nameplate capacity (§ 13 EnEfG). Additional obligations from 500 kW (§ 17 EnEfG).
Reuse Obligation
Data centres from 1 MW: 10% Energy Reuse Factor (ERF) from 1 July 2026, 15% from 1 July 2027, 20% from 1 July 2028. Evidence via the Data Centre Register and the Waste Heat Platform.
Deadlines
Annual report due by 31 March of the following year. First filing to the Waste Heat Platform was 1 January 2024; first ERF audit by 31 March 2027.
Platform
Data Centre Register (BAFA) + Waste Heat Platform (BfEE). As of January 2025: 2,668 companies, 19,065 waste heat potentials, 160 TWh/year aggregated.
🇫🇷France
Port in preparationLegal Basis
| Law | Loi n° 2025-391 du 30 avril 2025 (DDADUE) |
| Decree | Décret n° 2025-1382 du 29 décembre 2025 |
| Codification | Art. L.236-2 Code de l'énergie |
Competent Authority
Direction générale de l'énergie et du climat (DGEC), Ministère de la Transition écologique
Reporting Obligation
Data centres from 500 kW IT load. Annual public filing on area, energy consumption, installed capacity, and waste heat utilisation.
Reuse Obligation
Data centres from 1 MW must valorise waste heat via a heating or cooling network, achieve a numerical indicator of 0.20, or demonstrate a cost-benefit exemption.
Deadlines
First filing was 15 May 2024, compliance deadline was 11 October 2025. Subsequent filings annually by 15 May.
Platform
National filing to DGEC, supplemented by the EU database per Annex II of Delegated Regulation 2024/1364.
🇳🇱Netherlands
Port in preparationLegal Basis
| Transposition | Transposition of Directive (EU) 2023/1791 via the RVO reporting procedure |
| Framework law | Omgevingswet (Environment Act, 2024) |
| Mandatory measures | Erkende Maatregelenlijst (Recognised Energy-Saving Measures List) |
Competent Authority
Rijksdienst voor Ondernemend Nederland (RVO)
Reporting Obligation
Data centres from 500 kW IT load (EU basis). Additional audit obligation from 50,000 kWh/year electricity or 25,000 m³/year gas.
Reuse Obligation
Data centres from 1 MW: waste heat utilisation or documented exemption (EU basis per Art. 26 EED).
Deadlines
Annual filing by 15 May. A standalone data centre law has not yet been published; regulatory pressure is increasing after the 2026 Leitmotiv audit (104 of approximately 160 data centres reported, several hyperscalers submitted empty forms).
Platform
RVO portal feeding into the EU database.
🇮🇪Ireland
PreliminaryLegal Basis
| EED transposition | In preparation by the Interdepartmental Working Group |
| Regulation | CRU decision December 2025 |
| Grid rules | EirGrid and ESB Networks framework by end of March 2026 |
Competent Authority
Commission for Regulation of Utilities (CRU), additionally Sustainable Energy Authority of Ireland (SEAI, monitoring)
Reporting Obligation
Data centres from 500 kW IT load (EU basis).
Reuse Obligation
New data centres must feed power back to the grid after six years and source 80% of consumption from renewables. Waste heat utilisation is secondary due to weak district heating infrastructure; exemption on grounds of technical impossibility is the norm.
Deadlines
Annual EED filing from 15 May 2026. CRU implementation rules expected by end of March 2026.
Platform
gov.ie and SEAI monitoring.
🇮🇹Italy
On holdLegal Basis
| Status | Transposition deadline of 11 October 2025 missed |
| Draft | Decreto legislativo in public consultation |
| Additional framework | Decreto Energia 2025 |
| Management system | ISO 50001 mandatory for enterprises above 85 TJ/year from 11 October 2027 |
Competent Authority
Expected: MASE (Ministero dell'Ambiente e della Sicurezza Energetica) and GSE (Gestore dei Servizi Energetici)
Reporting Obligation
Data centres from 500 kW IT load from 15 May 2026 (EU basis).
Reuse Obligation
Data centres from 1 MW (EU basis per Art. 26 EED).
Deadlines
Annual EED filing from 15 May 2026. National deadlines follow the Decreto legislativo.
Platform
EU database via MASE/GSE (expected).
🇪🇸Spain
On holdLegal Basis
| Status | Draft Real Decreto in public consultation since 15 September 2025, draft published 16 December 2025 |
| Requirements | PUE < 1.2, NIS2 cybersecurity, mandatory emissions reporting |
Competent Authority
Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO)
Reporting Obligation
Data centres from 500 kW IT load (EU basis).
Reuse Obligation
Data centres from 1 MW (EU basis per Art. 26 EED). Spanish additional requirements stricter than EU baseline.
Deadlines
Upon adoption of the Real Decreto, expected Q2–Q3 2026.
Platform
MITECO portal, supplemented by the EU database.
🇸🇪🇩🇰🇫🇮Nordics (Sweden, Denmark, Finland)
On holdLegal Basis
| Transposition | Directive (EU) 2023/1791 via national energy agencies |
| Specificity | District heating is widespread; waste heat utilisation is already practised voluntarily |
Competent Authority
Energimyndigheten (SE), Energistyrelsen (DK), Energiavirasto (FI)
Reporting Obligation
Data centres from 500 kW IT load (EU basis).
Reuse Obligation
Data centres from 1 MW (EU basis per Art. 26 EED).
Deadlines
Annual EED filing from 15 May 2026 for reporting year 2025.
Platform
National energy agencies feeding into the EU database.
3. Non-EU Facilities
Norway and Switzerland are maintained in the Ardor platform under bilateral recognition but are not subject to EED obligations. The United Kingdom is likewise not bound by the EED post-Brexit; ESOS and a developing Energy Security Bill apply there. For these countries, Ardor maintains facility data in the marketplace but does not generate EU-compliant compliance reports.
4. Deadline Overview
| Date | Event |
|---|---|
| 2024-09-15 | First EU-wide filing per Del. Reg. 2024/1364 |
| 2025-05-15 | Second annual filing EU-wide (reporting year 2024) |
| 2025-10-11 | EED 2023/1791 transposition deadline (France: compliance date) |
| 2026-05-15 | Annual filing (reporting year 2025), first mandatory round for Italy, Nordics |
| 2026-07-01 | Start of 10% ERF quota for new German data centres from 1 MW (§ 11 EnEfG) |
| 2027-03-31 | First ERF audit by BAFA for Germany |
| 2027-05-15 | Annual filing (reporting year 2026) |
| 2027-07-01 | Increase of German ERF quota to 15% |
| 2028-07-01 | Increase of German ERF quota to 20% |
5. Further Reading
- Methodology: Calculation model, data sources, and verification procedures.
- WHC White Paper: Discussion paper on the European waste heat certificate.
- Directive (EU) 2023/1791 (EUR-Lex).
- Delegated Regulation (EU) 2024/1364 (EUR-Lex).
- EnEfG (gesetze-im-internet.de).